Used Rail Track For Sale

Chinese standard relay rails for sale! 43kg used rail and 50kg used rail are available.

Immediate Quote
43kg-used-rail-track

43kg used rail

  • Rail type: 43kg/m
  • Standard: Chinese Standard GB2585-2007
  • Nominal weight: 44.65kg/m
  • Material: 50Mn, U71Mn
  • Length: 12.5m-25m
Get Free Quotation
50kg-used-rail-track

50kg used rail

  • Rail type: 50kg/m
  • Standard: Chinese Standard GB2585-2007
  • Nominal weight: 51.51kg/m
  • Material: 50Mn, U71Mn
  • Length: 12.5-25m
Get Free Quotation

Used rail track or used rail is a kind of rail reused after removing from heavy busy lines. The used rail track does not refer to the material that is removed and used again after the rail reaches the limit. The used rail mentioned here forms a graded use system of rails based on technical and economic analysis so that heavy new rails are on the exhausted mainline. After being used for a certain period, it will be replaced, comprehensively renovated by the factory, and then laid on the next-level line for use. In this way, heavy rails in better condition are always used on the continuous trunk line, and laying the refurbished heavy rails on the secondary line strengthens the track structure of the secondary line and reduces maintenance costs.

Application of used rail track

Mines, forests, and other sites need the used rails generally inside roadways for building temporary transportation lines, and light locomotive lines. Also, gantry cranes and crane installations need used rails. They can save a lot of costs compared to using new rails. The effect can be said to be the same.

Grade of used rail track (Chinese Standard)

  • Class 1

The great surface condition with no or little wear can be reused without reconditioning.

  • Class 2

Slightly worse than Class 1, can be reused after comprehensive recondition (milling the railhead ).

  • Class 3

The surface condition is between Class 2 and Class 4, can be relayed on the secondary level line after regular recondition (no use of milling the railhead).

  • Class 4

The surface condition is close to minor injuries which can not be restored.

used-rail-track-for-sale
Rail damageLimit value (mm)
Class 1Class 2Class 3Class 4
60kg/m50kg/m60kg/m50kg/m60kg/m50kg/m60kg/m50kg/m
vertical wear  <3<3<4<4<6<5.5<9<8
side wear  <5<5<10<10<13<11<14<12
corrugation  <0.1<0.1<1.0<1.0<0.5<0.5<0.5<0.5
the thickness of the rail bottom edge  ≥9≥8≥9≥8≥7≥6≥6≥5
the thickness of the rail web  ≥14≥14≥14≥14≥13≥11≥12≥10
Single-sided pit depth<4<4<4<4<5<5<5<5
Flaking depth and length  Depth<0.5;length<5Depth<0.5;length<5Depth<1.5;Depth<1.5;Depth<2.5;length<15Depth<2.5;length<15Depth<3.0;length<15Depth<3.0;length<15
Surface friction depth  <0.5<0.5<1.5<1.5<1.5<1.5<2.0<2.0
Flaking Crack depth  00<1.5<1.5<1.5<1.5<2.0<2.0
Gauge baffle mark depth  <3.0<3.0<3.0<3.0<3.5<3.5<4.0<4.0
Plastic flow  ≤1.0≤1.0≤3.0≤3.0≤2.0≤2.0≤3.0≤3.0
Grade of used rail track

InnoTrans 2026 Berlin, Germany

2026.09.22-25 Hall 9 – Stand No. 282-283

OUR PARTNERS

Before Sending Your Enquiry

Please leave your details, and we will arrange for technical personnel to respond to you within one business day.

What is the rail section type, and is there a request for unit length?

Quantity of rails or equipment

The material request on the rail

Technical requirements and attached drawings if possible

Once you provide detailed information, we will have a deeper understanding of your needs and can offer a targeted solution. We look forward to further collaboration with you!

Copyright @2026 AGICO

Contact us

AGICO Group

8F, Building 2, Huaqiang New Times, Xian’ge Avenue, Hi-Tech Industry Development Zone, Anyang, Henan, China

Phone: +86 372 5081 703

Email: info@railroadrails.com